Skip to content
FARAAKEST. 1986 · KARACHI

Capabilities

What Faraak Can Make, and How

This page answers the technical questions buyers usually ask on a first call. If something you need is not listed, ask us on WhatsApp. If we cannot do it, we will say so and, where we can, point you to someone who can.

Machines

The floor, in numbers

Buyers who know garments read this table first. It is our credibility in table form.
  • MachineSingle needle lockstitch
    Count30
    Used forFrock assembly, dresses, sheets, woven work
  • MachineOverlock (3 and 5 thread)
    Count12
    Used forSeam finishing, knitwear assembly
  • MachineDouble needle
    Count2
    Used forHems, parallel stitching
  • MachineZigzag
    Count2
    Used forShirring, gathering, elastic work
  • MachineBartack
    Count1
    Used forStress points, loops
  • MachineButtonhole
    Count1
    Used forFrocks, shirts
  • MachineButton attach
    Count1
    Used forFrocks, shirts
  • MachineCutting tables and pressing
    CountTables
    Used forCutting, fusing, finishing

This is our core line. Ask about flatlock finishing or any machine not listed here.

Products

What we make

Girls' frocks and dresses (our specialty since 1986). Casual cotton frocks, party frocks, baby frocks, sizes from infant to 12 years. Gathering, frills, piping, linings, smocking, trims, zips, and buttons. This is the work the unit was built on.

Kidswear beyond frocks. Skirts, pajama sets, rompers, and similar items, subject to sampling.

T-shirts and basic knits. Crew neck and polo styles for kids and adults. With your labels, tags, and packing.

Hospital bed sheets and ward linen. Flat sheets, pillow covers, draw sheets, and patient gowns. Sized to institutional specifications and stitched to survive industrial laundering.

What we do not do in-house: heavy embroidery, all-over printing, and dyeing. We work with trusted partner units in Karachi for these and manage the process for you. We tell you this upfront because you should know exactly where your garment is made.

Capacity

Honest numbers, stated plainly

8,000

Pieces per month at present staffing

Current capacity is 8,000 pieces per month at present staffing. Capacity scales with order volume: the unit holds 50machines and we hire experienced machinists from Karachi's large garment workforce as orders grow.

We say this plainly: we have capacity available right now. For you, that means sampling starts within days and production starts without a queue.

Fabrics

Supply your own, or we source it

Lawn & voile

60–90 GSM

Frocks, summer dresses, kurtis needing soft fall and clean gathers

Cotton cambric & poplin

90–130 GSM

Kidswear and kurtis. Crisp, durable, kind to detailed stitching

Linen & linen blends

120–180 GSM

Premium dresses and kurtis. Demands accurate cutting, the work we like

Cotton twill

180–280 GSM

Structured pieces, pinafores, workwear, institutional items

Polyester & poly-cotton

90–200 GSM

Hospital sheeting, uniforms, budget-sensitive runs

Knits (jersey, pique)

140–220 GSM

T-shirts and polos, finished on overlock and twin needle

You can supply fabric, or we can source it. Karachi gives us direct access to cotton poplin, lawn, cambric, knits (single jersey, pique, interlock), and polycotton sheeting. For sourced fabric, we share counter samples and prices before cutting anything.

Quality process

Five checkpoints, every order

Defective pieces are repaired or replaced before shipment, not argued about after it.
  1. 1

    Fabric on arrival

    Checked against the approved sample before anything is cut.

  2. 2

    Cutting

    Checked against the pattern before bundling.

  3. 3

    Inline

    Checked at the machine during stitching.

  4. 4

    Final inspection

    Every piece: measurements, stitching, trims, threads.

  5. 5

    Packing check

    Packed to your specification, with your labels and tags.

Packing and labeling

Packed your way

Folded and poly-bagged as standard. Your woven labels, hang tags, size stickers, and carton markings as required. Tell us your requirement at quote stage so it is priced in, not added later.

Ready to talk minimums and timelines? See low MOQ manufacturing or CMT and contract stitching.